Your cost price across the chain
Before you order tooling, you see what every part, every joint and every box adds to your unit price. You decide on changes by cost per unit, not by feel.
Before you order tooling, our engineers review your product as one whole: every part, how it goes together, the box it ships in, the freight it pays for and where each piece is made. Every finding comes with its effect on your cost per unit. The review is free, takes one to two weeks, and the report is yours to use with any manufacturer.
A part can be perfectly mouldable while the product stays too expensive. A tool maker's DFM check asks whether their tool can make your part: draft, wall thickness, parting line, gate. That is needed, but it doesn't look at the other parts, the assembly line, the box or the container. Two parts that are each easy to make can still add up to four screws, a gluing step and a box full of air. Those costs arise after the moulding machine, and they sit in every unit price you pay afterwards.
Five links, reviewed together, because a change in one moves the cost in the others.
Can every part be made well and consistently?
A tighter tolerance makes the tool more expensive and raises the reject rate. We ask where it is really needed.
Does every part earn its place, and does it go together quickly?
Merging two parts saves an assembly step but can ask for a more complex tool. You see both sides in cost per unit.
How much air are you shipping?
A base your customer clicks on themselves makes the box smaller, but moves an assembly step to your customer.
Where is each part made, and how dependent are you?
Making parts closer to assembly saves freight and lead time, but often costs unit price.
Can the product come apart?
A glued joint is often cheaper on the line than one that comes apart. We put both in numbers.
As soon as the function is fixed and there is a bill of materials, and before you release the tooling. Earlier makes little sense, because the design is still moving. Later is possible, but the price of a change goes up with every step.
In our process this is phase 1, before any steel is ordered. See the four phases
An edit in CAD. Hours of work, no steel.
The tool design is redone and the schedule shifts.
The tool goes back to the milling machine. That costs steel and weeks.
Your files are covered by our standard NDA. Prefer your own? We'll sign it.
That deserves a critical look. It is exactly why the report is yours and goes with you to any manufacturer. A finding that only holds if we do the production falls apart the moment someone else reads it.
The tool maker and the software review the part. We also run the assembly, the packaging and the freight, so we see those costs ourselves.
Before you order tooling, you see what every part, every joint and every box adds to your unit price. You decide on changes by cost per unit, not by feel.
Per finding the issue, the cause, the proposal and what happens if nothing changes, with no quotation in between. The design stays yours; we write it so you can forward it unchanged. Each review applies to one revision of the model, so after sign-off it is on record what was reviewed and what changed later.
Before you invest: can the product be made the way the team drew it, and does the cost price in the business plan hold? We work out the cost of goods sold across the whole chain, including assembly, packaging and freight, and show where the risks sit.
Nothing. The review is the first step of our quotation process and doesn't commit you to anything. A physical test, such as a printed assembly model or a packed test shipment, is agreed separately.
One to two weeks from the moment your files are complete. A physical test takes extra time. Plan the review as its own step before the tooling order, not in parallel with building the tool.
A 3D model of every part, preferably as STEP files, a bill of materials with materials and purchased parts, the intended assembly sequence, volumes per year, the sales channel and the destination. With a target cost per unit we can rank the findings straight away.
Yes. The report is yours, and you can share it with whoever you like. There is no quotation in it, so a design agency can forward it to its client unchanged.
Then we review again, but only the links the change touches. That is why every review applies to a revision of the model. A different wall thickness touches only that part; a different housing size also touches the box, the pallet and the freight.
Your files are covered by our standard NDA before anyone opens them, and we'll sign your own if you prefer. We manufacture to your specification and never compete with our clients' products.
Book a call, or mail your STEP files and bill of materials to contact@productionheroes.nl. An engineer looks at them, not a sales rep.